2008: The investment of the Treatment Sludge Drying Plant with capacity of 250 t/day was started in 2008 and completed and put into service at the end of the year.
|
|
| |
|
|
2008: Capacity of production of clinker was increased to 4.400.000 ton/year in 2008.
|
| |
|
|
2007:
It was invested for desinalization of salt water in order to meet increased water requirement in port of Nuh Cement in 2007 and by increasing the capacity in 2008, it is supplied to water production 400 m3 in hour, 200.000 m3 in month on the average.
|
|
| |
|
|
2006:
The investment of 4th
cement mill with a capacity of 320 t/h was started in 2006 and
scheduled to be completed in 2007.
|
|
| |
|
|
2005: In
2005, the investment of building up 4 silos was started and
completed in 2006.
|
|
| |
|
| 2004: Total capacity increased to 4.100.000 tones/year by adding the III.
Klinker Production Line with 2.000.000 tones/year. The harbor line which was previously 250 m expanded on to 595 m by lengthened first 200 m and then 145 m, |
|
| |
|
| 2002: Trass Plaster Storage unit with 400 tones/hour started to run, |
|
| |
|
| 2001: XRF, XRD, and TG-DTA/DSC devices started to use, |
|
| |
|
| 1999: Multipurpose unloading crane with a capacity of 650 tones/hour started to run, |
|
| |
|
| 1996: Ship-to-coast project with 1.000 tones/hour capacity and automatic ship loading system, |
|
| |
|
| 1995: One LM 16.2 coal grinder started to run. The capacity of II. oven line increased to 3.000 tones/day by precalcinating it with ACT-Pasec system, |
| |
|
| 1994: Trass grinder with 125 tones/hour capacity started to run. Gammametrics on-line analyzer started to run, |
| |
|
| 1993: The capacity of two cement grinders increased to 140 tones/hour OPC by the combi-grinding method, |
| |
|
| 1991: Crusher with a capacity of 1.500 tones/hour. A pre-homogeny facility with 50.000 tones capacity established, |
|
| |
|
| 1990: The capacity of I. oven line increased to 120 tones/day by precalcinating it with ACT-Pasec system, |
|
| |
|
| 1987: A cement grinder with 180 tones/hour capacity established, |
|
| |
|
| 1983: Two LM 16.2 coal grinder built and upgrading the fuel system, |
|
| |
|
| 1974: II. Oven line with a capacity of 400.000 tones/year built which increased the production capacity to 800.000 tones/year, |
|
| |
|
| 1971: Port built onto the factory front field, |
|
| |
|
| 1969: I. oven clinker production line with 400.000 tones/year and clinker grinding facilities established, |
|
| |
|
| 1968: Factory foundation was laid, |
|
| 1966: Factory foundation was laid, |
|
| |
|
| 1966: Company was established, |
|
| |
|