From Past to Present

1966 – Foundation of the Company

1966 – Foundation of the Company

Factory Groundbreaking

1969 – Opening of the Facility

1969 – Opening of the Facility

Establishment of 1st Furnace Clinker, Production Line Clinker and Grinding Plants

1971 – Scaffold Construction

Scaffold Construction in Factory Preliminary Field

1974 – 2nd Furnace Line

Construction of 2nd Furnace Line with a Capacity of 400.000 Ton/Year with an Increase in the Production Capacity to 800.000 Ton/Year

1983 – Coal Mill and Renewal

1983 – Coal Mill and Renewal

Construction of Two LM 16.2 Coal Mill and Performance of Fuel System Renewal Works

1987 – Cement Mill

1987 – Cement Mill

Establishment of Cement Mill with a Capacity of 180 Ton/Hour

1990 – Capacity Expansion

Increase of Capacity of the 1st Furnace Line to 120 Ton/Day through Precalcination with ACT-Pasec System

1991 – Homogenizing System

Establishment of Cracking System with a Capacity of 1,500 ton/hour and Preliminary Homogenizing System with a Capacity of 50,000 Tons

1993 – Mill Capacity Expansion

1993 – Mill Capacity Expansion

Increase of Capacity of Two Cement Mills to 140 Ton/Hour By Means of Combi-Grinding Method

1994 – Trass Mill

1994 – Trass Mill

Commissioning of a Trass Mill with a Capacity of 125 Ton/Hour and Gammametrics Online Analyzer

1995 – Capacity Expansion of the 2nd Furnace

Commissioning of LM 16.2 Coal Mill and Increase of Capacity of the 2nd Furnace to 3.000 Ton/Day

1996 – Automatic Ship Loading

Startup of Forwarding Ashore Project and Automatic Ship Loading System with a Capacity of 1.000 Ton/Hour

1999 – Commissioning of Discharging Crane

1999 – Commissioning of Discharging Crane

Commissioning of a Multi-Purpose Discharging Crane with a Capacity of 650 Ton/Hour

2001 – Integration of New Equipment

2001 – Integration of New Equipment

Putting XRF, XRD and TG-DTA/DSC Devices into Use

2002 – Trass Plaster Stockhole

Commissioning of a Trass Plaster Stockhole with a Capacity of 400 Ton/Hour

2004 – 3rd Clinker Production Line

Increase of Capacity of the 3rd Clinker Production Line to 4,100,000 Ton/Year and Port Length to 595 m

2005 – 3rd Clinker Production Line

2005 – 3rd Clinker Production Line

Startup of 4-Compartment Cement Silo with a Capacity of 8.000 Tons

2006 – Online Tracking of Flue Gas Data

2006 – Online Tracking of Flue Gas Data

Integration of Horizontal-Ball Cement Mill and Establishment of Flue Gas Data Online Tracking System

2007 – Port Facility Improvements

Investment in desalting salty water, capacity expansion in 2008 and monthly average production of 200 thousand m3 water

2008 – Capacity Expansion of Clinker

Increase of clinker capacity to 4,400,00 ton/year and commissioning of Sewage Sludge Drying Plant with a Capacity of 250 ton/day

2010 – Modernization Works

2010 – Modernization Works

All rotary furnace electrofilters are turned into bag-type filters in scope of the modernization investment for filters.

2012 – Waste-Heat Power Generation

Increase of capacity of sea-water desalting plant to 600 m3/hour and commissioning of RDF (Refuse Derived Fuel) Feeding System and 18-MW Waste-Heat Power Generation Plant